Short answer

200A provides more total capacity than 100A. The decision is not made from service size alone: existing demand, planned equipment, panel configuration, utility scope and load-management options all matter.

Key takeaways

01100A may be adequate for some homes and projects.

02200A may be practical when several high-demand loads are planned.

03A contractor’s applicable load calculation is the decision evidence.

What changes

Increasing from 100A to 200A can require more than a larger panel. Service conductors, meter equipment, the service mast or lateral, grounding/bonding and utility coordination may all enter the scope.

When 100A may remain

A modest project, lower existing demand or suitable approved load management may allow the existing service to remain.

Plan for the home, not one appliance

A ten-year equipment plan gives the contractor better information than designing around only the next EV charger or air conditioner.

Field notes / decision evidence

Compare the decision, not just the number

100A and 200A describe nominal service ratings. Use the same evidence for either path.

01

If 100A remains

Confirm the calculated demand and the exact equipment plan that the conclusion depends on. If load management is used, identify the approved product and the load it controls.

02

If 200A is proposed

Ask what physical components must change, who requests utility approval, whether a temporary outage is needed and which work is outside the electrical quote.

03

If the answer is uncertain

Separate known equipment from assumptions. Utility supply, concealed service routing and future appliance choices can remain provisional until investigated.

Illustrative scenarioExample only: two houses with 100A mains can reach different outcomes because one has electric space and water heat while the other does not. A single amperage label is not a load calculation.

Decision table

What the evidence changes

100A
Potentially adequate depending on actual demand
200A
Greater total capacity; may involve utility-side work
Decision evidence
Applicable load calculation and site assessment

Key distinctions

What each rating does and does not establish

100A nominal200A nominal
What the number isA nominal service rating.A larger nominal service rating.
What it does not proveThat the home cannot take a new load.That the home needs it, or that the rest of the service is in good condition.
Evidence that decidesLoad calculation with existing and planned equipment.Load calculation, utility feasibility and component-by-component scope.
Alternative worth asking aboutApproved load or energy management, where suitable.Retaining the existing service if the calculation supports it.
Rules that applyProvincial code in force plus local permit authority.Same — rules are provincial, not a national default. In Alberta the province lists CSA C22.1-24 as in force since April 1, 2025.

Typical project sequence

From question to documented work

  1. 01Inventory current loads
  2. 02List near- and long-term projects
  3. 03Compare retain / manage / upgrade paths
  4. 04Confirm permit and utility scope

Sequence and responsibilities vary by jurisdiction, utility and scope.

Evidence

Sources and verification

Published by the 200AmpPanel.ca Research Team, a HAUSE specialist property. Updated 2026-09-29.

Questions

Frequently asked

Is 100A enough for an EV charger?

Sometimes. Charger size, existing demand, charging controls and approved energy management all affect the answer.

What should I do next?

Use the Capacity Check to organize what you know, then have a qualified electrical contractor complete the assessment required for the property and jurisdiction.

Your next step

Bring the right facts to the first conversation.

Record the visible service clue, planned equipment and any relevant documents. The free brief organizes your questions; a qualified person verifies capacity and scope.

Build my evidence brief Email HAUSE about an assessment ↗