A HAUSE specialist propertyHAUSE.ca

Process

Electrical service-upgrade process

A homeowner view of assessment, design, permits, utility coordination, inspection and reconnection.

Verified official sourcesLast checked August 31, 2026

Short answer

A typical service change moves from assessment and calculation through design, permit, utility coordination, disconnect, installation, inspection, reconnect and documentation. The exact sequence varies by jurisdiction and scope.

Key takeaways

01Permit and utility processes are separate but connected.

02Power-off timing should be planned before installation day.

03Closeout should include permits, inspection status and equipment documentation.

Before work

The contractor confirms the existing service, calculates demand, defines equipment and identifies permit and utility requirements.

Installation day

Where required, the serving utility coordinates disconnection. The contractor completes the approved scope and the authority inspects according to local procedure.

After reconnection

The homeowner should receive the written scope, invoice, applicable permit/inspection records, equipment information and warranty details.

Decision table

What the evidence changes

Homeowner role
Provide access, equipment plans and decision approvals
Contractor role
Design, permits, installation and coordination
Authority / utility
Inspection, service procedures and supply-side work as applicable

Typical project sequence

From question to documented work

  1. 01Assess
  2. 02Calculate
  3. 03Design
  4. 04Permit
  5. 05Coordinate utility
  6. 06Disconnect
  7. 07Install
  8. 08Inspect
  9. 09Reconnect
  10. 10Document

Sequence and responsibilities vary by jurisdiction, utility and scope.

Evidence

Sources and verification

Published by the 200AmpPanel.ca Research Team, a HAUSE specialist property. Updated 2026-08-31.

Questions

Frequently asked

How long will the power be off?

The outage window depends on the scope, utility procedure, inspection path and site conditions. Ask for a project-specific plan.

What should I do next?

Use the Capacity Check to organize what you know, then have a qualified electrical contractor complete the assessment required for the property and jurisdiction.

HAUSE Capacity Check

Start with what your home needs to support.

Get a transparent electrical-capacity pre-check before deciding whether to retain, manage or upgrade the service.

Check my capacity Request professional assessment